platzhalter

Views
4 years ago

KEIM Edition No. 2: Schmuttertal Grammar School

  • Text
  • Grammar
  • Schmuttertal
  • Buildings
  • Diedorf
  • Florian
  • Wooden
  • Hermann
  • Pupils
  • Kaufmann
  • Nagler

SCHMUTTERTAL GRAMMAR

SCHMUTTERTAL GRAMMAR SCHOOL 1 2 4 3 ZT GmbH kten GmbH 1 Classroom 81245 München with open-plan learning environments Projektnummer Archiv Planinhalt 2 Classroom with open-plan learning environments 11_38 M 1:750 1. OBERGESCHO 3 Administration wing with auditorium 4 Gym Theodor-Storm-Str.16 Fon 089 / 820 051 - 0 Fax 089 / 839 287 - 43 diedorf@nagler-architekten.de diedorf@hermann-kaufmann.at Publikationsplan Plannummer CAD Projekt 2_veröffentlichungen hk IV 825 GYMNASIUM DIEDO On leaving the school, the impression remains that this is an exemplary achievement. Instead of superficial, sensationalist, spectacular architecture, the convincing buildings stand out with unobtrusive, quiet solutions that have nevertheless been thought through right down to the very last detail. Detailed records were kept of the pilot project sponsored by the DBU (German Federal Environmental Foundation) and all the experience gained with the project has been put in the public domain to make it accessible for every planner. And so there are good chances that the grammar school in Diedorf may be replicated elsewhere. 16

PROJECT INFORMATION PROJECT PARTICIPANTS Client Educational concept Architecture Project management Cost planning Structural engineering HVAC planning Fire safety planning Energy concept Structural and room acoustics, thermal construction physics Electrical planning Light planning Hazardous materials, eco-footprint and lifecycle costs Landscape planning Project support and coordination Safety und security coordination Wooden construction companies Monitoring and quality assurance Augsburg District, represented by District Administrator Martin Sailer LernLandSchaft, Röckingen Mariagrazia Lanza, Maha Kutay “Diedorf” consortium: Hermann Kaufmann + Partner ZT GmbH, Schwarzach Florian Nagler Architekten GmbH, München Department for Structural Engineering Augsburg District, represented by Senior Director of Construction Frank Schwindling Architect Roland Wehinger merz kley partner GmbH, Dornbirn Wimmer Ingenieure GmbH, Neusäß Bauart Konstruktions GmbH & Co. KG, München ip5 Ingenieurpartnerschaft, Karlsruhe Müller-BBM GmbH, Planegg Consultant engineers Herbert Mayr, Rommelsried Lumen3 GbR, München Ascona GbR, Gröbenzell ver.de landschaftsarchitekten GbR, Freising kplan AG, Abensberg InterQuality Service AG, Augsburg Kaufmann Bausysteme, Reuthe ZÜBLIN Timber GmbH, Aichach ZAE Bayern, Garching FACTS AND FIGURES Location Schmetterlingsplatz 1 86420 Diedorf Construction period 09/2013 – 09/2015 Main effective space 7.816 m² Net floor space 14.048 m² Gross floor space 16.046 m² Gross building volume 81.390 m³ Primary energy requirement without userinduced consumption Primary energy requirement incl. userinduced consumption Installed power PV array Facade glaze Glaze on inner wooden structures AWARDS 39,7 kWh/m²a 62,9 kWh/m²a 440 kWp KEIM Lignosil-Verano in grey 4861 KEIM Lignosil-Inco, white German Prize for Architecture 2017 (1st prize) DGNB Prize for Sustainable Construction 2016 (1st prize) German Prize for Wooden Construction 2017 (prize for new-build) Iconic Awards 2018 (Innovative Architecture Selection) Bavarian Energy Prize 2016 (category: building as energy system) Geplant + Ausgeführt 2017, IHM trade fair prize (special prize: Focus Healthy Construction) Vorarlberg Prize for Wooden Construction 2017 (recognition from outside the country) 17